How Many Questions Of CLSSGB Exam Dumps

Cause all that matters here is passing the GAQM CLSSGB exam. Cause all that you need is a high score of CLSSGB Certified Lean Six Sigma Green Belt (CLSSGB) exam. The only one thing you need to do is downloading Testking CLSSGB exam study guides now. We will not let you down with our money-back guarantee.

Also have CLSSGB free dumps questions for you:

NEW QUESTION 1
SPC charts typically have the most recent data point on the right hand side.

  • A. True
  • B. False

Answer: A

NEW QUESTION 2
The Alpha level of a test (level of significance) represents the yardstick against which P-values are measured and the Null Hypothesis is rejected if the P-value is which of these?

  • A. Less than the Alpha level.
  • B. Greater than the Alpha level.
  • C. Greater than the Beta and Alpha level.
  • D. Less than one minus Alpha.
  • E. Less than the power of one minus Beta.

Answer: A

NEW QUESTION 3
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a __________.

  • A. Data Forward Plot
  • B. Bag Plot
  • C. Min/Max Plot
  • D. Time Series Plot

Answer: D

NEW QUESTION 4
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.

  • A. True
  • B. False

Answer: B

NEW QUESTION 5
A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a customer desired result.

  • A. True
  • B. False

Answer: A

NEW QUESTION 6
Which of the following is used to test the significance for the analysis of a Variance Table?

  • A. t Test
  • B. F Test
  • C. Chi Square Test
  • D. Acid Test

Answer: B

NEW QUESTION 7
Conducting a viable Capability Analysis using Attribute Data one must obtain a fairly large sample set to be statistically sound.

  • A. True
  • B. False

Answer: A

NEW QUESTION 8
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
Voice of the Customer is a Lean Six Sigma technique to determine __________ attributes of a product or service.

  • A. At least 6
  • B. The profitable
  • C. Critical-to-Quality
  • D. The majority of the

Answer: C

NEW QUESTION 10
The Purchase Orders for Glenn Manufacturing Company were being copied by an employee and sent to four different departments yet only one department took an action based on the information in the PO. This is an example of __________.

  • A. External Failure Costs
  • B. Appraisal Costs
  • C. Internal Failure Costs
  • D. Prevention Costs

Answer: C

NEW QUESTION 11
Inferential Statistics is largely about Significance. There are both Practical and __________ Significance to consider during an analysis of data in a Lean Six Sigma project.

  • A. Problematic
  • B. Impractical
  • C. Usable
  • D. Statistical

Answer: D

NEW QUESTION 12
While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?

  • A. Straighten
  • B. Sort
  • C. Shine
  • D. Sustain

Answer: D

NEW QUESTION 13
To create standardization of financial benefit calculations project savings are typically based on savings over what period of time?

  • A. 6 months
  • B. 12 months
  • C. 24 months
  • D. The remainder of the calendar year
  • E. The remainder of the fiscal year

Answer: B

NEW QUESTION 14
In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?

  • A. 12 months
  • B. 24 months
  • C. The remainder of the calendar year
  • D. The remainder of the fiscal year

Answer: A

NEW QUESTION 15
Lean Six Sigma’s general approach to solving significant challenges related to a process is called __________.

  • A. DOE
  • B. SIPOC
  • C. DMAIC
  • D. FMEA

Answer: C

NEW QUESTION 16
Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ’s which stands for __________.

  • A. Cost of the quantity
  • B. Conscious thought qualities
  • C. Conspicuous time quandaries
  • D. Critical-to-quality

Answer: D

NEW QUESTION 17
An employee of ACME Corporation noticed that every loan application that gets approved is copied four times and is stored in different locations in the company for no apparent reason. This would be an example of __________.

  • A. Internal Failure Costs
  • B. Appraisal Costs
  • C. External Failure Costs
  • D. Prevention Costs

Answer: A

NEW QUESTION 18
The Empirical Rule is important because it provides an estimate of the probability of an event occurring depending on the Standard Deviation from the Mean.

  • A. True
  • B. False

Answer: A

NEW QUESTION 19
......

Recommend!! Get the Full CLSSGB dumps in VCE and PDF From DumpSolutions.com, Welcome to Download: https://www.dumpsolutions.com/CLSSGB-dumps/ (New 200 Q&As Version)