Down To Date CLSSGB Dumps For Certified Lean Six Sigma Green Belt (CLSSGB) Certification

It is impossible to pass GAQM CLSSGB exam without any help in the short term. Come to Exambible soon and find the most advanced, correct and guaranteed GAQM CLSSGB practice questions. You will get a surprising result by our Up to date Certified Lean Six Sigma Green Belt (CLSSGB) practice guides.

Free CLSSGB Demo Online For GAQM Certifitcation:

NEW QUESTION 1
It is a Type II error if we decide to reject the Null Hypothesis when it is actually true.

  • A. True
  • B. False

Answer: B

NEW QUESTION 2
Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.

  • A. True
  • B. False

Answer: A

NEW QUESTION 3
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart

Answer: A

NEW QUESTION 4
A 1-Sample t-test is used to compare an expected population Mean to a target.

  • A. True
  • B. False

Answer: A

NEW QUESTION 5
Examples of Mistake Proofing for a laptop computer include which of these? (Note: There are 2 correct answers).

  • A. USB connection for a mouse
  • B. Open/Close button for CD Drive
  • C. Battery alignment pins
  • D. On/Off switch for computer

Answer: AC

NEW QUESTION 6
The Standard Deviation for the distribution of Means is called the __________ and approaches zero as the sample size reaches 30.

  • A. Standard Error
  • B. Mean Deviation
  • C. Mean Spread
  • D. Mean Error

Answer: A

NEW QUESTION 7
According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work when they use their personal vehicles for their office commute while management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. For the employees choosing to increase their chances to come on time using personal transportation their variation should be reduced to __________?

  • A. 1 minute
  • B. 6 minutes
  • C. 3.5 minutes
  • D. Eliminate it to 0.0 minutes

Answer: C

NEW QUESTION 8
Long-term Data represents all the variation that one can expect within the subject process.

  • A. True
  • B. False

Answer: A

NEW QUESTION 9
Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.

  • A. Standard Deviation
  • B. Mean
  • C. Median
  • D. True value

Answer: D

NEW QUESTION 10
While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?

  • A. Straighten
  • B. Sort
  • C. Shine
  • D. Sustain

Answer: D

NEW QUESTION 11
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.

  • A. True
  • B. False

Answer: B

NEW QUESTION 12
The Central Limit Theorem helps us understand the __________ we are taking and is the basis for using sampling to estimate population parameters.

  • A. Analysis
  • B. Kurtosis
  • C. Risk
  • D. Route

Answer: C

NEW QUESTION 13
A Belt gathered the following defect data for a shoe production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting38 Forming17 Stitching56 Sealing42

  • A. Forming, Sealing, Cutting, Stitching
  • B. Sealing, Stitching, Forming, Cutting
  • C. Stitching, Sealing, Cutting, Forming
  • D. Forming, Cutting, Sealing, Stitching

Answer: C

NEW QUESTION 14
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).

  • A. Common
  • B. Random
  • C. Uneducated
  • D. Special
  • E. Vital

Answer: AD

NEW QUESTION 15
Fractional Factorial designs for an experimental approach are used when __________ about the multiple metric interaction in a process.

  • A. Much is known
  • B. Little is known
  • C. We don’t care
  • D. Data exists

Answer: B

NEW QUESTION 16
Which of these is Discrete data?

  • A. Train arrived at 4:17 pm.
  • B. Race car consumed 23 gallons of fuel.
  • C. Of the 42 people on the bus, 12 went into the station.
  • D. It took 3 hours and 32 minutes to complete the marathon.

Answer: C

NEW QUESTION 17
The X-Y Diagram is a tool used to identify/collate potential X's and assess their relative impact on multiple Y's.

  • A. True
  • B. False

Answer: A

NEW QUESTION 18
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a __________.

  • A. Data Forward Plot
  • B. Bag Plot
  • C. Min/Max Plot
  • D. Time Series Plot

Answer: D

NEW QUESTION 19
......

100% Valid and Newest Version CLSSGB Questions & Answers shared by Dumpscollection.com, Get Full Dumps HERE: https://www.dumpscollection.net/dumps/CLSSGB/ (New 200 Q&As)