It is impossible to pass The-Open-Group OG0-093 exam without any help in the short term. Come to Testking soon and find the most advanced, correct and guaranteed The-Open-Group OG0-093 practice questions. You will get a surprising result by our Improved OG0-093 TOGAF 9 Combined Part 1 and Part 2 practice guides.

Online The-Open-Group OG0-093 free dumps demo Below:

NEW QUESTION 1

Which ADM phase includes establishing the Architecture Capability and definition of Architecture Principles?

  • A. Phase B: Business Architecture
  • B. Preliminary Phase
  • C. Phase A: Architecture Vision
  • D. Phase F: Migration Planning
  • E. Phase C: Data Architecture

Answer: B

Explanation:
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap02.html

NEW QUESTION 2

Complete the sentence. A gap analysis will enable the architect to do all of the following except .

  • A. identify building blocks that have been inadvertently omitted
  • B. identify building blocks that have been intentionally eliminated
  • C. identify building blocks to be carried over
  • D. identify new building blocks that are needed
  • E. identify potential vendors to provide new building blocks

Answer: E

NEW QUESTION 3

Which of the following best describes the TOGAF classification in Phase H for a re-architecting change?

  • A. A change driven by a requirement to derive additional value from the existing investment
  • B. A change driven by a requirement to increase investment in order to create new value for exploitation
  • C. A change driven by a requirement to reduce costs
  • D. A change driven by a requirement to reduce investment
  • E. A change driven by a requirement to re-align with the business strategy

Answer: B

NEW QUESTION 4

Which section of the TOGAF template for defining principles should highlight the requirements for carrying out the principle?

  • A. Implications
  • B. Name
  • C. Rationale
  • D. Statement

Answer: A

NEW QUESTION 5

Which of the following statements about TOGAF Building Blocks and their use in the ADM cycle is correct?

  • A. Building Blocks become more implementation-specific in Phase E
  • B. Building Blocks in phases D, E and F are evolved to a common pattern of steps
  • C. Building Blocks should be identified in abstract form as part of the Preliminary Phase
  • D. Building Blocks should be first selected in Phase D

Answer: A

NEW QUESTION 6

According to the TOGAF Document Categorization Model, which category describes a technique that is referenced by processes categorized as TOGAF Core and TOGAF Mandated?

  • A. TOGAF Guidelines and Techniques
  • B. TOGAF Recommended
  • C. TOGAF Supporting
  • D. TOGAF Extension

Answer: B

NEW QUESTION 7

According to TOGAF, which of the following types of architecture has major characteristics that include open system standards and general building blocks?

  • A. Common Systems Architecture
  • B. Foundation Architecture
  • C. Industry Architecture
  • D. Organization-Specific Architecture

Answer: B

NEW QUESTION 8

Which of the following describes a key objective of the Technology Architecture Phase?

  • A. To define the solution architecture needed to support the Application Architecture
  • B. To define technology components into a set of technology platforms
  • C. To define the Transition Architectures needed to achieve the Target Architecture
  • D. To develop a migration plan to deliver incremental capabilities
  • E. To select a set of technology products that will form the basis of a solution architecture

Answer: B

NEW QUESTION 9

Which of the following is a responsibility of an Architecture Board?

  • A. Creating the Statement of Architecture Work
  • B. Allocating resources for architecture projects
  • C. Identifying the Lead Enterprise Architect to manage an architecture compliance review
  • D. Establishing targets for re-use of components
  • E. Conducting assessments of the maturity level of architecture discipline within the organization

Answer: E

NEW QUESTION 10

Which of the following best describes the purpose of the Business Scenarios technique?

  • A. To guide decision making throughput the enterprise
  • B. To catch errors in a project architecture early
  • C. To identify and understand requirements
  • D. To identify risk when implementing an architecture project
  • E. To highlight shortfalls between the baseline and target architectures

Answer: C

NEW QUESTION 11

Which of the following does the TOGAF standard describe as a package of functionality defined to meet business needs across an organization?

  • A. An application
  • B. An architecture viewpoint
  • C. A building block
  • D. A deliverable
  • E. A solution architecture

Answer: C

NEW QUESTION 12

Which of the following is part of the Preliminary Phase?

  • A. Creating the Architecture Vision deliverable
  • B. Preparing a consolidated Gap Analysis
  • C. Developing the Architecture Contract
  • D. Defining a set of Architecture Principles

Answer: D

NEW QUESTION 13

Which of the following best describes the Standards Information Base?

  • A. A repository area that defines the parameters, structures, and processes to support governance.
  • B. A repository area that describes the organization specific architecture framework and methodologies.
  • C. A repository area that provides guidelines, templates, and pattern used to create new architectures.
  • D. A repository area that lists a set of specifications to which architectures must conform
  • E. A repository area that provides a record of the governance activity across the enterprise.

Answer: D

Explanation:
Reference https://pubs.opengroup.org/architecture/togaf91-doc/arch/chap41.html

NEW QUESTION 14

Which of the following is defined by TOGAF as a representation of a system from the perspective of a related set of concerns?

  • A. Architecture Building Block
  • B. Capability Architecture
  • C. Statement of Work
  • D. View
  • E. Viewpoint

Answer: D

NEW QUESTION 15

Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company
is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.
At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Scenario
During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.
You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.
Based on TOGAF 9, which of the following is the best answer?

  • A. The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholder
  • B. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.
  • C. The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier lis
  • D. Based on the findings from the research, the team should define a preliminary Architecture Visio
  • E. The team should then use that model to build consensus among the key stakeholders.
  • F. The team should use stakeholder analysis to understand who has concerns about the initiativ
  • G. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario techniqu
  • H. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.
  • I. The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholder
  • J. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.

Answer: A

NEW QUESTION 16

According to TOGAF, which of the following is the usual approach for developing the Baseline Business Architecture if no architecture or few architecture assets exist?

  • A. Bottom up
  • B. Envisioning
  • C. Extensive
  • D. Refactoring
  • E. Top down

Answer: A

NEW QUESTION 17

Which one of the following is the most generic artifact in the Architecture Continuum?

  • A. Common Systems Architecture
  • B. Foundation Architecture
  • C. Industry Architecture
  • D. Organization Specific Architecture
  • E. Product Line Architecture

Answer: B

NEW QUESTION 18

Scenario
Please read this scenario prior to answering the Question
Your role is that of Lead Enterprise Architect for a chain of convenience stores. The chain includes over 15,000 retail outlets throughout the Asia-Pacific region. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.
The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.
These changes will provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.
The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.
The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the decision for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise has been taken.
Refer to the scenario
You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.
Based on TOGAF, which of the following is the best answer?

  • A. You propose that the target architecture is defined first, followed by transition plannin
  • B. This is because the vision is well understood and the strategic architecture agree
  • C. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.
  • D. You propose that this engagement define the baseline architecture first in order to assess the current infrastructure capacity and capabilit
  • E. The initial priority is to understand the proble,. Then the focus should be on transition planning and architecture deploymen
  • F. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
  • G. You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strateg
  • H. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagemen
  • I. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.
  • J. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to chang
  • K. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.

Answer: A

NEW QUESTION 19

Which of the following describes a purpose of an Architecture Compliance review?

  • A. Identifying business transformation risks for an architecture project
  • B. Identifying where standards may require modification
  • C. Identifying relationships between management frameworks
  • D. Identifying stakeholders and their concerns

Answer: B

Explanation:
Reference
http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap24.html

NEW QUESTION 20

Scenario:
Please read this scenario prior to answering the question
The ABC company is the prime contractor for the Telesto Unmanned Spacecraft program. Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. The company is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, the company needs to define Baseline and Target Architectures. These architectures must address key stakeholders' concerns such as:
* 1. What groups of people should be involved in procurement-related business processes?
* 2. What current applications do those groups use?
* 3. Which procurement-related business processes are supported by zero, one, or many existing applications?
* 4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects? What
non-procurement applications will need to be integrated with any new procurement applications?
* 5. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative, so all assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle. The company is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Refer to the Scenario.
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation. Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Baseline Business Process catalogDescribe the Baseline Application Architecture with a Technology Portfolio catalogDescribe the Baseline Data Architecture with a Data diagramIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Actor/Process/Data catalogDescribe the Target Application Architecture with a System/Technology matrixDescribe the Target Data Architecture with a Data Dissemination diagram
  • B. In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the key business objects with Product Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a Data Entity/business Function matrix and a System/Data matrixIn the later iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the Baseline Application Architecture with a System/Organization matrix and a System/function matrixDescribe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • C. In the early iterations of the Architecture Definition:Describe the Target Business Architecture with a Business Service/Function catalog and an Organization/Actor catalogDescribe the key business objects with Data Lifecycle diagramsDescribe the Target Application Architecture with Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrixIn the later iterations of the Architecture Definition:Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business Interaction matrixDescribe the Baseline Application Architecture with an Application and User Location diagram and a System/Function matrixDescribe the Baseline Data Architecture with a Data Entity/Data Component catalog
  • D. In the early iterations of the Architecture Definition:Describe the Baseline Business Architecture with an Organization/Actor catalogDescribe the Baseline Application Architecture with a System/Function matrixDescribe the Baseline Data Architecture using a Data Entity/Data Component catalogIn the later iterations of the Architecture Definition:Describe the Target Business Architecture with an Organization/Actor catalogDescribe the Target Application Architecture using Application Communication diagrams and an Application Interaction matrixDescribe the Target Data Architecture with a System/Data matrix

Answer: C

NEW QUESTION 21

Which of the following is an objective of Phase B, Business Architecture?

  • A. To confirm the ability of the enterprise to undergo change
  • B. To demonstrate how stakeholder concerns are addressed in the Business Architecture
  • C. To develop a Target Technology Architecture to support the business
  • D. To finalize the Architecture Vision and Architecture Definition documents
  • E. To maximize the business value from the architecture

Answer: B

NEW QUESTION 22

Which one of the following is recommended to define requirements and articulate the Architecture Vision created in Phase A?

  • A. Business scenario
  • B. Impact analysis
  • C. Mission statement
  • D. Requirements analysis
  • E. Solution architecture

Answer: A

NEW QUESTION 23
......