Your success in Oracle 1z0-1057 is our sole target and we develop all our 1z0-1057 braindumps in a way that facilitates the attainment of this target. Not only is our 1z0-1057 study material the best you can find, it is also the most detailed and the most updated. 1z0-1057 Practice Exams for Oracle Oracle Other Exam 1z0-1057 are written to the highest standards of technical accuracy.

Check 1z0-1057 free dumps before getting the full version:

NEW QUESTION 1
Identify the three contract attributes from Project Performance Data that are used in Project Performance dashboard regions. (Choose three.)

  • A. Expenditure Type
  • B. Projects
  • C. Contract Line
  • D. Contract Header
  • E. Task

Answer: BCE

Explanation:
Reference https://docs.oracle.com/cloud/farel9/projectcs_gs/FAUAR/F1537947AN10251.htm

NEW QUESTION 2
A consulting services company is currently working on a business transformation project for your client, which spans multiple years. At the first period close, the consulting services company has recognized revenue and the accounting entry created is:
Dr Unbilled Receivables 40,000 Cr Revenue 40,000
At the end of the period, the client is sent an associated bill. What would be the corresponding invoice accounting entry? (Choose the best answer.)

  • A. Dr Unearned Revenue 40,000Cr Accounts Receivables 40,000
  • B. Dr Accounts Receivables 40,000Cr Unbilled Receivables 40,000
  • C. Dr Accounts Receivables 40,000Cr Revenue 40,000
  • D. Dr Unearned Revenue 40,000Cr Revenue 40,000

Answer: B

NEW QUESTION 3
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)

  • A. Class codes should be associated with a related set code.
  • B. Class categories should be assigned to business unit.
  • C. Class categories should be assigned to project type.
  • D. Class codes should be assigned to project unit.

Answer: AC

Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuratio

NEW QUESTION 4
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation? (Choose two.)

  • A. Manage Project Plan Resource Assignment
  • B. Transfer Project
  • C. View Project Progress
  • D. Allocate Project Expense

Answer: AC

Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjm/index.html#_Toc468200732_1_

NEW QUESTION 5
Your organization has created an Enterprise Project Structure (EPS) and your executives review the overall project labor demand by using the EPS. Identify two correct statements about the periodic project labor demand. (Choose two.)

  • A. Labor Demand FTE is calculated as Quarterly Allocation hours divided by Quarterly FTE hours, if aquarter is used as the basis for viewing labor demand.
  • B. Labor Demand FTE is calculated as Yearly Allocation hours divided by Yearly FTE hours, if a year is used as the basis for viewing labor demand.
  • C. Labor Demand FTE is calculated as Project Allocation hours divided by Project FTE hours, if project duration is used as the basis for viewing labor demand.
  • D. Labor Demand FTE is calculated as Monthly Allocation hours divided by Monthly FTE hours, if a period is used as the basis for viewing labor demand.

Answer: AB

Explanation:
Reference https://docs.oracle.com/cloud/farel10/projectcs_gs/OAPEM/OAPEM1461017.htm#OAPEM1313472
Project Labor Demand: How It's Calculated
Project executives want to track the labor demand in projects in their organization. The Project Hierarchy Viewer provides project executives a hierarchical view of the enterprise project structure (EPS) along with the labor demand in terms of full-time equivalent (FTE).
Settings That Affect Project Labor Demand
Project application administrators must do the following to set up how project labor demand is calculated: 1Z0-1057 dumps exhibitOrganize projects into hierarchical groups on the Manage Enterprise Project Structure page.
1Z0-1057 dumps exhibit Change the quarterly FTE hours for the organization on the Define Project Management Implementation Options page, if different from 520 hours.
Note: You can choose to view labor demand annually instead of quarterly. The Project Hierarchy Viewer uses the current date to determine which year or quarter to display.
How Project Labor Demand Is Calculated
The Project Hierarchy Viewer calculates project labor demand in the following manner:
1Z0-1057 dumps exhibit Spreads the allocation hours from the Manage Project Resources page evenly over the days that the resources are allocated to the project.
1Z0-1057 dumps exhibit Divides the quarterly project allocation hours by the quarterly FTE hours to get the labor demand.
1Z0-1057 dumps exhibit Rolls up the quarterly and annual labor demand up the hierarchy.

NEW QUESTION 6
Your business user has created a purchase order (PO) that has the following attributes: Accrue at Receipt = Yes
Matching Option = 2 way Receipt Close Tolerance = 100%
After approval, the PO is closed for receiving without creating a receipt. An AP invoice is created by matching to the PO. The user now runs Create Accounting for Receiving Transactions and then the “Import and Process Cost transactions” ESS (Enterprise Scheduler Service) job using the Transaction Source parameter as “Oracle Payables”. The user notices that there is no cost transferred to the projects. Identify two reasons for this problem. (Choose two.)

  • A. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to NO, cost is transferred to projects by receipt accounting.
  • B. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to YES, cost is transferred to projects by Cost Management and not by Payables.
  • C. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to Yes, cost is transferred to projects only if there are accounted receipt lines.
  • D. When you have an AP invoice that is matched against a PO with Accrue at Receipt set to Yes, cost is transferred to project by payables.

Answer: BC

NEW QUESTION 7
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes in HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers. (Choose the best answer.)

  • A. Pool Membership
  • B. attributes that the project enterprise resources are assigned after creation
  • C. Jobs
  • D. Person Type

Answer: D

Explanation:
Reference https://docs.oracle.com/cloud/farel8/projectcs_gs/OAPEX/F1082603AN23E61.htm
Manage Project Enterprise Labor Resource Maintenance Conditions
Project Enterprise Labor Resources: How They Are Automatically Created and Maintained
Run the Maintain Project Enterprise Labor Resources process to create resources, remove resource availability for staffing, and maintain the resource search index.
Settings That Affect the Maintain Project Enterprise Labor Resources Process
Create and maintain project enterprise labor resources by defining a set of conditions that specify the employees and contingent workers in Oracle Fusion Human Capital Management (HCM) to create as resources in Oracle Fusion Project Portfolio Management. Define the resource attribute values, such as the resource calendar and primary project role, to assign to the new resources.
The following table lists the criteria that you define for selecting HCM persons to create as project enterprise labor resources.
Selection Criteria Description Person type
Select the HCM person type for the process to use as criteria when selecting HCM persons to create as resources. Available person types are employees, contingent workers, or both employees and contingent workers.
Option to select people based on job
Select this option for the process to create resources for HCM persons with specific jobs.
Caution If you do not select job criteria for this condition, the process will create resources for all eligible people based only on the person type.
Jobs
If you selected the option to select people based on job, then select the jobs for the process to use as HCM person selection criteria.
The following table lists the attributes for which you specify values to assign to resources that are created for the condition.
Resource Attribute Description
Option to manage resource availability and staffing
Select this option for resource managers to manage the availability and project staffing of resources who are created based on the condition. Resources who are managed in Oracle Fusion Project Resource Management are eligible to fulfill project resource requests.
Calendar
Select the resource calendar for resources that are created based on the condition. The resource calendar defines the work schedule for project enterprise labor resources, and includes working days and hours and any exceptions, such as holidays.
Primary project role
Select the primary project role for resources that are created based on the condition. Project roles are maintained in Oracle Fusion Project Management.
Cost rate and currency
Enter the cost rate and currency for resources that are created based on the condition. Bill rate and currency
Enter the bill rate and currency for resources that are created based on the condition.

NEW QUESTION 8
When implementing Project Performance Reporting, your customer has the following requirements:
1Z0-1057 dumps exhibit Every time a project cost is greater than or equal to a threshold, then the project should be shown as critical.
1Z0-1057 dumps exhibit As long as a project cost is less than the threshold, the project should be shown as on-track.
Which threshold level rule is ideal for this kind of KPI definition? (Choose the best answer.)

  • A. multiple threshold levels
  • B. single threshold level value
  • C. single threshold level range
  • D. multiple threshold level value

Answer: B

Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjs/update-project-performance-data
Performance Status Indicator
Performance status indicators give an immediate picture of the status of a project, such as critical, at risk, and on track. Each distinct icon indicates the status and severity of performance. During KPI definition, you first associate status indicators with performance statuses:
1Z0-1057 dumps exhibit Critical
1Z0-1057 dumps exhibit Severe
1Z0-1057 dumps exhibit At risk
1Z0-1057 dumps exhibit On track
1Z0-1057 dumps exhibit Ahead
You then associate these statuses with threshold levels. When KPI values are generated for a project, each value is compared to the defined thresholds and the corresponding status indicator for the KPI appears on project performance reports.
A status can identify negative performance so that you can take the appropriate actions to prevent or quickly resolve problems. Conversely, a status can identify positive performance to help you track expected or excellent performance.
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/fapfm/implementing-project-financial- Create Key Performance Indicators
Create key performance indicators (KPI) to measure how well your organization performs an operational, tactical, or strategic activity that is critical for the current and future success of the organization.
Note: To create KPIs you must enable a project unit to track key performance indicators.
Use the Threshold Levels section to specify thresholds to indicate the health status of a KPI. Select one of the following options:
1Z0-1057 dumps exhibit Multiple threshold levels
1Z0-1057 dumps exhibit Single threshold level value
1Z0-1057 dumps exhibit Single threshold level range

NEW QUESTION 9
You are managing a project based on a Waterfall model. You define a project and a project plan in Oracle Project Portfolio Management with tasks and subtasks applicable to each of the phases of the project: Initiation, Discovery, Design, Build, Test, and Deploy. As a project manager, you want to define deliverables for your project requirements that are elucidated during the Discovery phase of your project. You now want to understand how the inheritance between requirements, tasks, and deliverables works. Identify the two correct statements in this respect. (Choose two.)

  • A. A deliverable associated with a requirement is automatically associated with the tasks created for that requirement.
  • B. The association of a deliverable with a task is dependent on associating a requirement with a task.
  • C. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
  • D. You associate a deliverable with a task, independent of associating a requirement with a task.

Answer: CD

Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/define-project-deliverables.html
Associate deliverables with one or many tasks or requirements at any level. Associate existing deliverables to tasks or requirements or create deliverables directly for tasks or requirements. You can delete a deliverable in New status if it is not associated with tasks or requirements.
Can deliverables for projects and tasks be inherited from associated requirements?
No. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
You associate a deliverable with a task, independent of associating a requirement with a task.

NEW QUESTION 10
Your customer wants additional project information for detailed account balance maintenance, reconciliation, and reporting. Identify the configuration in subledger accounting that can be set up to fulfill this requirement. (Choose the best answer.)

  • A. Accounting Method
  • B. Journal Rules
  • C. Supporting References
  • D. Accounting Rule
  • E. Mapping Sets

Answer: C

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125357.htm#OAPFM1125357
Assignment of Supporting References
Supporting references may be used to capture transaction values on journal entry lines. A supporting reference can be used on a journal entry rule set only if it's assigned a source from the event class of the journal entry rule set.
Creating Supporting References: Explained
Supporting references are used to store additional source information about a subledger journal entry at the line level.
Supporting references with balances establish subledger balances for a particular source and account for a particular combination of supporting references plus the account combination.
For example:
1Z0-1057 dumps exhibit If a journal line contains a supporting reference that includes two sources, Customer Type and Customer Name.
1Z0-1057 dumps exhibit Balances are created for the account combination, plus customer name and customer type. Examples of how you may want to use supporting reference balances are to:
1Z0-1057 dumps exhibit Facilitate reconciliation back to the subledgers and source systems by tagging journal entries with transaction and reference attributes.
1Z0-1057 dumps exhibit Create balances by dimensions not captured in the chart of accounts.
1Z0-1057 dumps exhibit Reporting using dimensions not captured in the chart of accounts.
1Z0-1057 dumps exhibit Enrich Oracle Fusion Business Intelligence Applications reporting on subledger journals.
1Z0-1057 dumps exhibit Profit and loss balances by dimensions not captured in the chart of accounts
Define supporting references to hold additional supporting information for detailed account balance maintenance or reconciliation and reporting requirements.

NEW QUESTION 11
Your customer has separate organizations to maintain indirect, capital, and billing types of projects. Identify the two setups that can be used to fulfill this requirement. (Choose two.)

  • A. Project Type
  • B. Business Unit
  • C. Project Organization Classification
  • D. Organization Tree
  • E. Project Accounting Business Function

Answer: CD

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/FAPFM/FAPFM1225328.htm

NEW QUESTION 12
You have defined two expenditure types, but they are not available for selection when you enter an expenditure batch. Identify the reason for this problem. (Choose the best answer.)

  • A. The two expenditure types are not assigned to the reference data set that is assigned to the project unitin which the transaction is performed.
  • B. The two expenditure types are not assigned to the reference data set that is assigned to the project-owning organization in which the transaction is performed.
  • C. The two expenditure types are not assigned to the reference data set that is assigned to the project expenditure organization in which the transaction is performed.
  • D. The two expenditure types are not assigned to the reference data set that is assigned to the business unit in which the transaction is performed.

Answer: A

Explanation:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf (19A Part # F11256-01) Chapter 3 – Define Project Organizations

NEW QUESTION 13
Your customer wants to see how quantity, cost, and revenue amounts are automatically distributed by using Spread Curve. Identify two period options that are available for this purpose. (Choose two.)

  • A. Calendar Types
  • B. Project Accounting Periods
  • C. Accounting Periods
  • D. PA Calendar
  • E. PA-GL Periods

Answer: BC

Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic/TopicId_P_87F467307D50416BE040D30A68816855
Spread curves let you distribute quantity, cost, and revenue amounts automatically across accounting or project accounting periods. You assign a spread curve to each resource class. Planning resources (in the planning resource breakdown structure) inherit the spread curve setting from the associated resource class. You can change the spread curve for the planning resource and for any corresponding task assignments, or budget or forecast lines.

NEW QUESTION 14
Which three are part of using the Rapid Implementation for Project Financial Management Applications macro-enabled Microsoft Excel spreadsheet to enter setup data?

  • A. Prepare setup data.
  • B. Import Projects.
  • C. Generate CSV files.
  • D. Upload setup data.
  • E. File Import and Export.

Answer: ACD

Explanation:
https://docs.oracle.com/applications/farel12/projectop_gs/OAPFM/OAPFM2264569.htm#OAPFM2159921 Configuring Rapid Implementation: Procedure
Project application administrators can use the rapid implementation feature to set up the Project Financial Management offering. Use the Rapid Implementation for Project Financial Management Applications macro-enabled Microsoft Excel spreadsheet to enter setup data and generate the ProjectsWorkbook.zip. Upload this .zip file to the Setup and Maintenance work area. When the upload completes, the offering is configured based on the setup information that you provide.
Perform the following steps to configure rapid implementation for the Project Financial Management offering:
1Z0-1057 dumps exhibit Prepare setup data.
1Z0-1057 dumps exhibit Generate CSV files.
1Z0-1057 dumps exhibit Upload setup data.
1Z0-1057 dumps exhibit Correct errors, if any, and reload the data.

NEW QUESTION 15
You are implementing Project Portfolio Management (PPM) for a professional services firm. The firm rents multiple buildings for its operations. At the end of each month, they review the rent expense for the month and want to allocate the rental cost to all the projects and tasks that are executed by associates in each of the buildings. The source amounts must be proportionally allocated to the tasks based on the raw costs of the tasks from the previous month. Considering that all these costs are in General Ledger, what three allocation setups should you complete in PPM? (Choose three.)

  • A. Allocate rental costs once each accounting period by using the “full” allocation method.
  • B. Allocate to all eligible tasks and prorate the allocation by the total actual raw cost accrued for each task during the previous accounting period.
  • C. Define allocation basis by using Actual Amounts with a project-to-date amount class.
  • D. Define allocation basis by using Actual Amounts with a period-to-date amount class.
  • E. Allocate rental costs once each accounting period by using the “spread evenly” allocation method.

Answer: ABD

NEW QUESTION 16
Which three setups can be configured by using Rapid Implementation for Project Financial Management Applications?

  • A. Departments
  • B. Expenditure Types
  • C. Project Templates
  • D. Project Types

Answer: ABD

NEW QUESTION 17
You are implementing Project Portfolio Management for a global professional services organization. In their Consulting Services line of business, it is common to use resources from different business units based on the skills required. Therefore, cross-charge transactions happen between business units within the same legal entity. Transfer price calculations need to be based on raw costs, with no further adjustments to transfer price.
Identify two setups that can drive this borrowed and lent agreement. (Choose two.)

  • A. Transfer price basis must be Raw Cost and calculation method must be Basis Only.
  • B. Transfer price basis must be Burdened Cost, and calculation method must be Burden Rate Schedule.
  • C. A document entry such as straight time must be enabled for cross-charge transactions.
  • D. Transfer price basis must be Raw Cost and calculation method must be Rate Schedule.

Answer: AC

Explanation:
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-billing-configuration-de

NEW QUESTION 18
Identify three correct statements about project types. (Choose three.)

  • A. Project type can be used as a source in subledger accounting.
  • B. Project type can be enabled for both billing and capitalization.
  • C. Summarization options can be specified at project type.
  • D. Classifications can be assigned at project type.
  • E. Project type can be associated with multiple project units.

Answer: ABD

NEW QUESTION 19
You have a small project for a period of five months. Your budget amount for each month is spread evenly and is $1000 per month. The first month actual expense is $800 and there is a commitment for $600. Now you generate a forecast at the beginning of the second month. Identify the monthly Estimate-To-Complete (ETC) amount that the application would calculate for the remaining four periods, when the ETC generation method includes commitments. (Choose the best answer.)

  • A. 1000B.-900C.800D.600

Answer: B

Explanation:
Budget 5,000Actuals 800Commitment 600 ETC = Budget – Actuals – Commitment
ETC = 5,000-800-600 = 3,600 Budget available for next 4 months = 3,600/4 = 900/month

NEW QUESTION 20
Your customer complains that their project resources do not report their time promptly, which has resulted in incorrect reporting of project performance. What should you do to fix this problem? (Choose the best answer.)

  • A. Enable track missing time at project unit.
  • B. Enable track missing time at project type.
  • C. Enable track missing time at project template.
  • D. Enable track missing time at business unit.

Answer: A

NEW QUESTION 21
......